Special Inspections. Coordinate work schedule with the Special Inspection Agency to ensure these are completed as required by stage of work.The Contractor must maintain their work site in a safe condition during construction and must minimize the risk of accidents and fire. However, certain changes may require an amendment. However, minor variations are allowed – see minor variations memorandum. Make sure work conforms to approved drawings. Make sure all active permits are conspicuously posted at the work site and visible to the public for the duration of the work. Check that the owner has hired the Special Inspection Agency and their details are submitted – a requirement for obtaining a permit. If necessary, update the general liability insurance when required. Comply with the insurance requirements for general liability insurance, workers compensation and disability insurance. If the scope is modified after approval, verify if changes need an amendment – refer to AC Section 28-104. Make sure Department-approved drawings clearly convey the project scope and the contracted work reflects the approved and full scope of work. This section contains a list of tasks to assist with compliance. This system, DOB NOW: Inspections provides the ability to request and cancel appointments online, as well as view inspection results and documentation.Project Checklists contain project-specific details as they apply to the scope of work of the project to provide compliance with the NYC Construction Codes and other regulations. Inspection RequestsĪn online tool for scheduling appointments for required DOB inspections must be used. Temporary Construction Equipment projects may require a final inspection by the NYC Department of Transportation (DOT). The applicant must submit revised ‘As-Built’ drawings prior to project sign-off. If the completed project has changes that are not significant or substantive, an ‘As-Built’ submission shall be allowed. Such self-certified inspections may be audited audit results will be provided to applicant and must be resolved prior to final sign-off.ĭepending on the above, DOB or the applicant shall complete the final sign-off inspection to close the project. If the applicant elected to self-certify the required DOB inspections, an online notice of intent to self-certify must have been submitted at the project start. Such inspection requests may be made online, and any objections raised may be resolved online. Submission of Special Inspections can be done online by Special Inspection Agency.ĭOB inspections may be required during various project stages. See other Project Guidelines for associated DOB Inspections.Įxcept for Temporary Hoistways, Construction Equipment projects do not require a final inspection. There are no required DOB inspections solely for the use of construction equipment. However, there may be required DOB inspections for associated projects that utilize construction equipment such as demolition or new construction. where the stability or integrity of a structural system is to be temporarily diminished, in accordance with Sections BC 1704.20.6 through 1704.20.10. If restrained either horizontally or vertically, alteration of existing structural systems or elements, such as columns, beams, bearing walls, seismic isolation, etc. The special inspection shall include the verification of compliance with approved construction documents and standards established by the commissioner pursuant to Section AC 28-113.2.2. The installation of post-installed mechanical anchors, adhesive anchors, and screw anchors shall comply with BC Table 1704.32. Per BC 1704.1.2, the Contractor cannot hire the special inspector.īased on the scope of work, a scaffold project may be required to comply with the following Special and Progress Inspection requirements:Ī Special Inspection is required per BC 1704.14 when the proposed Scaffold’s materials and systems are alternatives to materials and systems prescribed by this code for unusual design and/or materials and systems required to be installed in accordance with additional manufacturer’s instructions with requirements not contained in the building code or in standards referenced. The Applicant of Record may perform these inspections if they are also an SIA. Prior to Approval, the Applicant of Record is required to identify all required Special and Progress Inspections ( BC 1704.1). Prior to DOB permit issuance, the owner must typically engage a registered Special Inspection Agency (SIA) who will take responsibility for the Special and Progress Inspections. Scaffold Work & Inspections Special and Progress InspectionsĪs per Chapter 17 of the Building Code, scaffold work may require certain Special and Progress Inspections to be performed during and at the end of construction as outlined in the table below.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |